Sanford Stadium
Sanford Stadium is currently the 6th largest on campus stadium in the nation, the second largest in the SEC behind UT.
It sits right in the heart of campus, nested in a small valley and in my opinion is on of the prettiest stadiums in the nation. Below is a quick
history of the stadium.
Also, you can check out an
online tour of the
facilities. 1929: Sanford Stadium
Built
- Named for Dr. Steadman
Vincent Sanford, former University president and University System of Georgia
chancellor
- Seating Capacity:
30,000
- Construction cost:
$360,000
1940: Lights erected on
field level
1949: 6,000 seats added
to South stands
- New seating capacity to
36,000
1964: 7,621 seats added
to end zone
- New seating capacity to
43,621
- Lights removed from field
level
1967: Sanford Stadium
Double-Decked
- 19,640 seats added...new
seating capacity to 59,000
- Club level seating added,
press box area and President's box
- Project cost:
$3,000,000
- Architect: Heery &
Heery, Atlanta, GA
- General Contractor: Baugh
& Coody, Inc., Albany, GA
1981: East End
Enclosed
- 19,000 seats added....new
seating capacity to 82,122
- Project cost:
$11,500,000
- Architect: Finch-Heery,
Atlanta, GA
- General Contractor: Marvin
M. Black Co., Norcross, GA
1982: Light
Installed
- 12 poles
- 420 metal-halide
bulbs
- Bottom row of lights 150
feet above playing field
- Project cost:
$1,000,000
- Engineers: Inglett &
Stubbs, Inc., Atlanta, GA
- Architect: Lighting
Associates, Lithonia, GA
1984: Lettermen's Club
Added-East End
- 5,460 square feet
addition
- 3,000 square feet
dining/meeting room
- Project cost:
$386,390
- Architect: Heery-Fabrap,
Atlanta, GA
- General Contractor: Terry
Development, Athens, GA
1991: West End
Enclosed
- 4,205 seats added...new
seating capacity to 85,434
- Project cost: $3.7
million
- Architect: Heery
International Inc., Atlanta, GA
- General Contractor: Winter
Contruction, Altanta, GA
1994: 30 SkySuites
Constructed
- Double deck luxury
SkySuites atop South side upper deck
- 683 seats added...new
seating capacity to 86,117
- Project cost: $6 million
+
- Completed in August,
1994
- Architect: Heery
International Inc., Atlanta, GA
- General Contractor: Beers
Construction, Atlanta, GA
2000: SkySuite/SkyClub
Addition
- 20 new skySuites added to
existing 30 bringing total to 50
- SkyClub constructed at top
of south side upper deck directly under SkySuites
- New seating capacity to
86,520
- Project cost: $12
million
- Architect: Heery
International Inc., Atlanta, GA
- General Contractor:
Mitchell Construction
2003 & 2004: Upper Deck
Addition & Sky Suite
- Sanford Stadium Adds 5,500 New Seats in 2003; 688 New Seats in 2004
|